14 - It's Finished! Almost.. (April 2, 2022)
Everything is ready for move-in. Well almost. Paperwork for the Certificate of Occupancy isn't finished and has not been released by the city, so no keys until then.
However, I was able to sneak in and take pictures.
It's finished to the point that all appliances like the stove, dishwasher are in and working. All lights and light switches work. The water flows freely from the water faucets. The windows have been cleaned, the floors mopped, the fingerprints erased.
Man, it's done, I think!
Read MoreHowever, I was able to sneak in and take pictures.
It's finished to the point that all appliances like the stove, dishwasher are in and working. All lights and light switches work. The water flows freely from the water faucets. The windows have been cleaned, the floors mopped, the fingerprints erased.
Man, it's done, I think!
1 / 34
The front of the new home.
The big garage door faces north so there will always be shade in front to work on the car and stay cool. Just like I planned it.
- No Comments